Vehicle Tracker with Installation
This GPS tracker gives real time location, speed and direction from a simple web and mobile platform, ideal for private owners and small fleets who want visibility of their vehicle without a large monthly cost. It suits anyone wanting straightforward peace of mind rather than a full insurance approved system. The price includes the tracker and professional installation anywhere in the UK or Ireland.
£145.00 ex. VAT
- Thatcham-approved security products
- TASSA-accredited mobile installation
- Nationwide fitting at home, work or depot
- 24/7 UK control-room monitoring options
Simple tracking device with Tracker Software Platform
The Platform is designed for fleets and the private user, looking for a simple tracking device fitted to a vehicle which will provide invaluable information in the unfortunate event their vehicle is stolen.
What information does the platform provide?
With our GPS-based tracking device installed in your vehicle, you get real-time data sent directly to our web-based fleet management portal. Access your vehicle information anytime, anywhere, whether you’re on your mobile or at your desktop.
You will be able to receive real-time tracking information, including location, direction, and speed, in the event your vehicle is stolen.
Key Features of Our Platform
The platform offers a suite of features that streamline processes, enhance efficiency, and reduce operational costs for Fleet Customers. For the private user it enables you to monitor your vehicle at all times. With the user-ergonomic man-machine interface, customers can easily navigate the system, ensuring that they have the tools and data they need at their fingertips when monitoring their private vehicles without the need to spend large monthly fees.
Real-Time Fleet Tracking and Monitoring
The Security4vehicles monitoring capabilities provide fleet operators with real-time visibility of their vehicles, no matter their location. Our platform offers access to live feeds and historical tracking data, enabling customers to track their vehicles and respond promptly to any incidents or unplanned motion using motion alerts.
Dash Board View
View the current position of your vehicle overlaid onto a high-res map, including satellite imagery. You can customise the display to show detailed data such as vehicle reg, or vehicle description using a marker on the map. You can be made aware of unusual or unauthorised usage. You can locate missing or stolen vehicles.
The Dashboard provides detailed information about your vehicle’s journeys from start to finish. You can also drill down into specific time points to identify activities along the journey trail.
Seamless Mobile App
The mobile app puts the full power of our GPS fleet tracking platform at your fingertips for both Apple and Android-based mobile devices.
With its user-friendly interface, the app allows clients to access critical data, monitor vehicle performance, from anywhere. This mobile solution enhances flexibility, ensuring efficient fleet management on the go.
Full Specification
- App and Web for instant asset access
- High precision location information from 33 channel GPS receiver
- GPS Satellite Information
- Motion Alerts
- 30 day Journey History Retention
- Global coverage
- Battery Status Information
- Range of reports
- 12 and 24 volt Compatibility
- 1 Year Warranty
- Fully Transferable from vehicle to vehicle
Price includes the tracker and installation at a location of your choice in the UK or Ireland.
Additional information
| Mobile app included | Yes |
|---|
Nationwide Installation Services
With our professional mobile installation team of expert engineers spread throughout the country, our engineers will make sure you and your vehicle receive the right care and attention to detail with no unsightly cables or holes in the interior, looking as good as new. To reiterate all cables are concealed. We can install your system at any location convenient to you anywhere in the UK. We will ensure that you are 100% happy with your new system on completion giving you a quick guide on how to operate your new camera. The process is as follows:
- Place your order.
- We will contact you to get more details such as car make, model and registration and confirm where you would like the installation to take place.
- We will ship the Tracker directly to you.
- We will then contact you directly to arrange a convenient date and time to suit you.
- We aim to install your Tracker system as quickly as possible after ordering. However, this is dependent on both customer vehicle and installation engineer availability.
